JFK International

Airport

CTA Roadways, Utilities and GTC

40°38’40.6″N 73°46’46.9″W / Queens, NY, USA

Quick Facts

PANYNJ

Client

$1.24B

Contract Value

6

Roadway bridges

5

Miles of road

NYC Largest Airport

JFK International Airport

In June of 2023, Halmar and lead joint venture partner, Skanska, announced the award of the $1.24 billion design and reconstruction of JFK Airport’s Central Terminal Area Roadways, Utilities and Ground Transportation Center (GTC) expected for completion by December 2027. The design-build project consists of the design and construction of the on-airport roadway transportation network which includes roadway reconfiguration, maintenance and protection of traffic, intuitive wayfinding and enhanced traffic technologies, at-grade pavement, retaining walls and bridges as well as utility relocations and upgrades. The project will improve user connectivity and access to the surrounding terminals. Also included, is the design and construction of a modern Ground Transportation Center which features:

$

1,950-space multi-level vehicle parking facility equipped with electric vehicle charging stations and an eco-conscious timber façade

$

400-foot-long elevated pedestrian bridge and pedestrian canopies

$

Rainwater harvesting facility

$

Energy-efficient provisions for solar paneling